Sign in or register

My IntBuying

My shopping cart

   
Restaurant & Food Service> Grills & Griddles & Ovens>
022704:INTBUYING High Shear Emulsifying Pump Industrial Single Stage Pipeline Emulsion Pump for Homogenize Mixing
Unit:
pc
Price:
1,560.00$
Weight:
55.00kg
QTY:
Out Of Stock
           
     

Similar products

134221:INTBUYING Electric Countertop Griddle Commercial Adjustable Temperature Control Restaurant Cooking Flat Grill Stainless Steel 110V

134222:INTBUYING Stainless Steel Commercial Home Gas Grill Griddle Countertop Flat Cooking Griddle Grill LPG 2800Pa

134223:INTBUYING Stainless Steel Commercial Home Gas Grill Griddle Countertop Flat Cooking Griddle Grill LPG 2800Pa

022254:INTBUYING Electric Mini Griddle Stove Commercial Home Countertop Flat Cooking Griddle Grill Iron Machine Teppanyaki

022255:INTBUYING Nonstick Commercial Electric Countertop Flat Cooking Griddle Grill Iron Waffle Barbeque Pancakes Maker Food Stove Machine

New Emulsion pump High Shear Emulsifying Pump 110V 2.2KW

 http://topseller365.com/data/prd/022/704/17.jpg

biological medicine, food industry, cosmetic care,ink coating, nano materials, petrochemical, printing and dyeing auxiliaries,paper making, pesticides and chemical fertilizers, plastics, rubber,and other fine chemical mixing, dispersion and emulsification.

Specification:
power:2.2KW
Voltage:110V
Frequency:60HZ
Speed:2900r/min
Flow range:0-3m3/h
N-d:φ4-16mm
Inlet:38mm
Exit:32mm
Material:stainless steel 304

 http://topseller365.com/data/prd/022/704/15.jpg

http://topseller365.com/data/prd/022/704/BBBB.jpg

1.Check whether the import and export seal is good, there are no impurities, metal chips and other materials that have damaged equipment into the body.
2.Check whether the motor and the machine are in good condition when the transportation is out of the warehouse. When the power switch is connected, a safe contact motor device should be installed.
3.Before the connection between the import and export process pipe and the process pipe, first, clean the process pipeline, and ensure that the process pipeline without welding slag, metal chips, glass chips, quartz sand and other damaged equipment can be connected with the machine after the hard material.
4.The selection of the installation position of the TRL1 pipeline equipment and the nearest location of the container are such as the bottom of the container. The pipeline must be simple and direct, as far as possible to reduce the components of the elbow pipe, thus reducing the resistance of the material in the circulation process.
5.The choice of location for intermittent equipment installation is suitable for vertical level of containers. When dumping, it must be well sealed, moisture-proof, moisture proof, dust-proof and explosion-proof.
6.Before starting the machine, first, turn the spindle, the hands feel the light and heavy, flexible, no other frictional sound and abnormal sound.
7.When installing the pipeline, the inlet and outlet pipe adopts the clamp live connection structure.
8.After the completion of the above work, the power supply is started, and the steering axis of the motor steering axis is checked and checked repeatedly.
Attention and maintain
1. The cooling water is usually connected before the machine is opened, and the cooling water is shut down first and then the cooling water can be used.
2.The cooling water pressure is less than 0.2Mpa
3.The material must enter the working chamber, and it can be switched on. It is also necessary to ensure that it does not run in the condition of material failure, so as to avoid idling and cause mechanical seals (machinAdd a current protector when wiring the emulsion pump.burn out or affect service life.
4.Add a current protector when wiring the emulsion pump.
Important:
After confirming the sealing of the cooling water, the motor is started, and the motor steering should be operated with the steering sign of the main shaft, and the reversal is strictly prohibited!
It can not be Idle and Reversal!!!!!(You must be attention )
Item Number: 022704

You can make order with no worries.
Any concerns just feel free to let us know, we'll reply in 24 hours in normal condition.
Handling Time: Shipping is usually made in 1-3 business days after payments cleared. Orders are processed from Monday-Friday; Not on the weekends & public holidays.
Warranty: 6 months' warranty for the machines, not for the consumables.
We stand behind our products all the item, so even if your warranty period has expired, you can still seek for service or technical support from us with low cost.

无标题文档

About Us Product Service Shipping Payment Privacy refund Warranty

Copyright INTBUYING.com All Rights Reserved