Application method :
Please install builds the schematic drawing to carry on installing
equipment, and screws tight treadons the pull rod nut, inserts
the220V power source, turns on lathe turns clockwise turns on
the power source, the red candle brightly, then works, and
carries on thead
justment according to thin film thickness,
treadons down the green light to be bright, indicates heats
up, the green light extinguishes,
has completed
Matters needing attention:
This machine belongs to the electric appliance mechanical
product,
asks your excellency to pay attention moisture-
Please do not have to be flammable, the high explosive cargo
places this machine on seal, many thanks cooperation.
|