|
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
新建网页 1
|
Our product is a kind of high-grade ironing machine
with high pressure, continuous dry steaminputting, twice heating, and
non-blocked iron. Meanwhile, it has many features, such as feedingwater
automatically,floatless level auto-control,and heating cut-off
automatically as well, tomake the Generator keep working in a good
performance.
Especially suitable for dry
cleaner, curtain shops, small clothing factories, wallpaper, etc.
|
|
Parameters:
Heat Power:
3.5KW
Iron Power: 1KW
Rated Presure: 0.35-0.4MPa
Rated Steam Output: 3kg/h
Rated Temperature: 151℃
Voltage: 220V
|
|
Features: |
1.The gas volume is sufficient,
the enhanced automatic pumping device works steadily, the flow rate
increases, the strength increases, and the water supply protection of
the heating pipe is ensured.
2. Switch indicator light at a glance, easy to
operate.
3. Upgrade heat-resistant rubber wires and gas pipes to prevent damage
and make them more durable.
4.With visual pressure gauge.
5.With all metal
cold air system, can work all day.
|
Usage: |
1. Prepare a bucket of water, open the tank of
generator, pour some water in, put the inlet water pipe and the filter
into the bucket, it's better if they can close to the bottom.
2. Connect to 220V supply and ground.
3. Upward the switch blade on the left side of the machine. Press the
power switch to turn on the indicator. The pump will be controlled by
the solenoid valve to start to feed waterautomatically once the water in
the internal tank is under the downside line. And it will stopwhile the
water till to the given line.
4. Connect the iron to the solenoid valve via the hose pipe and tight
them.
5. Turn on the iron switch, press the steam switch on the iron handle,
then steam will be supplied through the solenoid valve. Iron temperature
can be adjusted by the knob.
6. The pressure gauge shows the reality steam pressure, the water level
will be controlled in a reasonable range by floatless level controller
and prober.
7. Once the pressure is over-high, open the spring safety valve to
relieve the internal stress. |
Notice: |
1. The generator must be grounding.
2. The radiator grille behind shouldn't be blocked, and keep the machine
dry.
3. Do not heat the boiler while the tank is empty, it will makes the
pump over-hot.
4. Use soft water instead of hard water.
5. open the drain valve at regular time to blow down.
6. Clean the scales in generator and prober every month. |
Details: |
|
|
|
|
|
Different places
have different receptacles. This is a 16A power plug. Please note this
plug and consult your electrician before purchase. |
Item
Number(239829):
|
You can make order with no worry.
Any concerns just feel free to let us know, we'll reply in 24 hours in
normal condition.
Handling Time: Shipping is usually made in 1-3 business days after
payments cleared. Orders are processed from
Monday-Friday; Not on the weekends & public holidays.
Warranty: 6 months' warranty for the machines, not for the consumables.
We stand behind our products all the item, so even if your warranty
period has expired, you can still seek for service
or technical support from us with low cost. |
|