Ball Mill Wet and Dry Dual-Purpose
Ball
Mill 220V |
| The dual-purpose ball mill is
widely used for fine grinding of ores in the mineral analysis
work in laboratories of departments of metallurgy, geology, coal
chemical, building materials, etc. It is also used in
conjunction with flotation machines and other instruments. The
conical ball mill is well-received by staff in relevant
departments due to the compact size, convenient operation and
reliable working efficiency. |
|
Voltage |
220V single-phase |
|
Ore Feeding Quantity |
0.4LB (200g) |
|
Fed Ore Particle Size |
<3mm |
|
Product Particle Size |
<0.074mm |
|
Packing dimension |
30.3*30.3*51.2 inches
(77*77*130cm) |
|
Net weight / Gross weight |
304.2LBs (138kg) / 378.1LBs
(171.5kg) |

| 1. Strictly connect to the
220V single-phase power supply, and ensure reliable grounding to
avoid leakage risks.
2. Confirm the cylinder material
compatibility before grinding various materials. Do not grind
strong corrosive materials. Do not overload the machine.
3. Regularly check the wear of
steel balls and replace them in time to ensure the grinding
efficiency.
4. After wet grinding, clean
the cylinder in time to avoid material residue and caking, which
affects the next experiment.
5. Do not open the cylinder
protection during operation to avoid mechanical injury.
6. Do not touch the running
parts during operation.
Do not put the hands into the machine.
Do not allow people or objects to be located next to the
running parts of the machine. |
|
1. The equipment configuration is
balanced and rational, the operation automation degree is high,
the ore feeding and discharging are electrically controlled for
convenient and rapid operation, the inclination angle is
adjustable at will, and the working noise is low.
2. The machine operation time can be
set arbitrarily, and all operations are displayed via an LCD
menu screen.
3. The ground fine material has a
uniform particle size, and the overgrinding degree is low, which
helps improve the quality of ore washability experiments.
4. The machine has a compact
structure. The transmission mechanism is simple and reliable,
low in lubricating consumption and easy and convenient to
maintain. No special foundation or workbench is needed for
installation and use, and it is easy to move and small in
occupied area.
5. The ore grinding efficiency is
high.
6. The power consumption for fine
grinding of materials per unit is low. |
 |
|
 |
|
Control Panel
The control panel is simple in structure and easy to operate,
integrating one-button start and stop and precise time control,
improving the level of automation, and ensuring the operation
safety and long service life.
|
|
Driving System
The high-quality motor and
transmission belt are combined to achieve stable transmission
and reliable operation. The motor is resistant to impact and
vibration and has a low fault rate. The belt is high in
flexibility and easy to replace.
|
 |
|
 |
|
Feeding Inlet
The conical feeding structure is
adopted to achieve smooth feeding of dry and wet materials,
effectively avoiding material blockage and preventing material
splashing. The feeding inlet can be easily opened and closed and
has excellent sealing performance.
|
|
Tilting Control Mechanism
The tilting control handle and the
worm gear structure are integrated to control the cylinder to
tilt at the appropriate angle, operation is easy and convenient,
the tilting angle can be flexibly adjusted, and the adaptability
and practicability are higher.
|
|
(I) Installation
1. Foundation: Fix the support legs onto the cement foundation
with expansion screws.
2. Trial running: It is normal when the rotation direction is
consistent with the indication mark.
(II) Usage
Note: The steel balls have been proportioned at the factory
and must not be altered arbitrarily by the user.
1. Run the machine without load to thoroughly clean the steel
balls and the inner wall of the cylinder.
2. Feeding Process:
(1) Before adding materials, grip the handle to rotate the
cylinder by 90° relative to the frame so that the feed inlet can
face upward.
(2) Release the handle, lock the position and use a wrench to
open the feed inlet.
(3) Add water, ores and reagents sequentially, and then securely
cover the feed inlet.
(4) Release the handle, rotate the cylinder back by 90°, and
lock it in place.
(5) Operate the machine for the preset duration.
3. Discharging Process:
(1) After the motor stops running, place a receiving basin in
position.
(2) Use a wrench to open the discharge outlet.
(3) Release the positioning lock with the handle, then downward
rotate the discharge outlet of the cylinder by 90°, and
discharge the ore pulp.
4. After completion, clean the machine thoroughly to prepare for
subsequent operation.
(III) Daily Maintenance
1. Clean the machine thoroughly after each use.
2. For intermittent use, add lime water into the cylinder with
when the machine is not in operation.
3. Before use, add the appropriate amount of grease to the oil
cup of the bearing pedestal.
4. Regularly inspect the power supply voltage and grounding to
ensure the good condition.
|
|
|
 |
 |
 |
 |
|
Item Included (021638):
1 x Wet and Dry Dual-Purpose Ball Mill 220V |
|
You can
make order with no worry.
Any concern just feel free to let us know, we'll reply in 24
hours in normal condition.
Handling Time: Shipping is usually made in 1-3 business days
after payments cleared. Orders are processed from Monday-Friday;
Not on the weekends & public holidays.
Warranty: 6 months' warranty for the machines, not for the
consumables.
We stand behind our products all the item, so even if your
warranty period has expired, you can still seek for service or
technical support from us with low cost. |
|